Pajhwok Services

Photo Service

SMS News Service

Pajhwok combines its expertise and experience in news reporting with a telecom firm and thus reach a wider audience in an 
effective way.

To subscribe: 
English News Update : Send 83 to 824
Dari News Update : Send 84 to 824
Pashto News Update : Send 85 to 824

Election Coverage

Special Mining Page

Media Release Service

Addvertise With Pajhwok

Pajhwok Mobile App

Daily Newsletter

Language
Sending Time (GMT / Kabul time)

Suggest a Story

Pajhwok is interested in your story suggestions. Please tell us your thoughts by clicking here.

$11m being spent on Salang tunnel renovation

$11m being spent on Salang tunnel renovation

By
On
Mar 02, 2013 - 16:48

CHARIKAR (PAN): Damaged by years of war and neglect, the Salang tunnel that represents the major north-south connection is being renovated with financial assistance from ISAF, an official said on Saturday.

Heralded as a marvel of engineering when completed in 1964, the Soviet-built tunnel would be completely repaved, from sealing leaks to repairing the lights, over the  next one year at a cost of $11 million, said Deputy Public Works Minister Ahmad Shah Wahid.

He told Pajhwok Afghan News preliminary repairs of the 11,000 feet high facility in the Hindu Kush mountains started last week. Construction work would be performed at night time and traffic allowed to use the tunnel in daytime until the repairs had finished, he said.

Vehicles would be allowed to travel through the tunnel at night only in an emergency situation, the official explained, saying the people going to Mazar-i-Sharif for new year celebrations on March 21 would also be allowed to use the tunnel.

The highway maintenance chief, Gen. Abdul Rajab, said his department was ready to face the situation arising from the closure of the tunnel at night. He added passenger vehicles would be allowed to travel in daytime and heavy vehicles on alternate days -- one day from the northern side and one day from the south.

Hafizullah, who runs a passenger car on the highway, said that driving through the tunnel was a pretty harrowing experience

The 35-year-old said water poured through holes in the wall and the road had deteriorated into a rough, bumpy and dirty track. He added the tunnel was barely wide enough for two-way traffic, and the uneven road surface meant trucks often flipped over.

ma/mud

 

Tags: